About time we fast track the construction of that hydro power plant. We really need to diversify our energy supply.

I wonder why its not an option to build a gas receiving facility at the Lekki deep port to supply gas to Egbin and a number of other power plants in the Lagos, Ogun and Ondo axis. In fact with that gas receiving facility, we could then concentrate more power plants in the western axis and side step the Niger delta for now while we resolve the issues there.I am sure Egbin would prefer to pay twice for the gas if they can guarantee generation and sales of their full power potential.

Fasola has a point in that we actually waste a lot of energy on air conditioning and water heating. For one we should ban the importation of the normal incandescent bulb and migrate the country to CFL/LED bulb with low wattage. A 10watt LED is equivalent of a 60W incandescent. That should save us some energy.