Determined to repair a portion of the narrow gauge threatened by washout around Osogbo, the Nigerian Railway Corporation (NRC) has deployed a team of engineers to the flood-ravaged area to fix the section.
The site, located at km 294+12 poles, Oke-Onitea area in Osogbo, suffered a washout following heavy rainfall on Saturday, May 17, 2025.
According to NRC, the remedial work is critical to maintaining safe and uninterrupted train operations for passengers travelling to Osogbo, Ilorin, and Minna corridors during the Eid festive season.
Managing Director/Chief Executive Officer, NRC, Dr. Kayode Opeifa, expressed regret over the washout but reassured passengers that all necessary steps are being taken to bring relief to the corporation’s esteemed passengers and ease train movement before the Eid-el Kabir celebration.
The NRC management also called on residents of Oke-Onitea and other communities along the rail corridors in Osogbo to refrain from dumping refuse indiscriminately, as such practices contribute to culvert blockages and rail infrastructure damage.
The Corporation reiterated its commitment to delivering safe, customer-focused rail services to the Nigerian public.